pk10计划免费软件怎么下载

The index number 014000319 / 2019-00287 Classification Regional planning and related policies, government documents, land approval
Release agency People's Government of Jiangsu Province Post date 2019-12-06
Title Reply of the Provincial Government on agreeing to the amendment plan for the overall land use planning of Yixing City and the towns (streets) under its jurisdiction
Document number Su Zhengfu (2019) No. 69 Subject word
Content Overview Reply of the Provincial Government on agreeing to the amendment plan for the overall land use planning of Yixing City and the towns (streets) under its jurisdiction
Aging

Provincial Government Consent

Yixing City and Zhangye Town (street) under its jurisdiction

Approval of the revision plan of the overall land use plan

(Su Zhengfu [2019] No. 69)

Wuxi Municipal People's Government:

Your city's request (Xi Zhengcheng [2019] No. 50) for the modification of the overall land use planning of Yixing City and the towns (streets) under its jurisdiction (Xizhengcheng [2019] No. 50) was received. The reply is as follows:

I agree in principle to Yixing City and its jurisdictions Zhangye Town, Hujing Town, Xiqiao Town, Wanshi Town, Taihua Town, Zhoutie Town, Xushe Town, Ding Shu Town, Guanlin Town, Yangxiang Town, Xinjian Town, Heqiao Town, Gaojiao Town, Huanting Street, Yicheng Street, Fangqiao Street, Xinzhuang Street, Xinjie Street Land Use Planning (2006-2020) Revised Plan. On the premise that the cultivated land holding amount and permanent basic farmland area determined by Yixing City's overall land use plan (2006-2020) will not decrease and the scale of construction land will not increase, 1777.4324 hectares of permitted construction areas will be transferred to restricted construction areas; 1080.6817 hectares will be transferred. Restricted construction areas were transferred to permitted construction areas, and 361.1199 hectares of restricted construction areas were transferred to conditional construction areas; 361.1199 hectares of conditional construction areas were transferred to permitted construction areas. After the revision of the plan, the permitted land area of the construction zone determined by Yixing City's overall land use plan (2006-2020) was reduced by 335.6308 hectares, and the restricted construction area was increased by 335.6308 hectares. This planning revision arranges Yixing City ’s "mine integration" special planning flow indicator of 1,000 hectares, and increases the planning of 1329.94 hectares of construction land control areas in villages and towns. Your city should instruct Yixing City to increase construction land reclamation efforts to ensure that the flow indicators are returned on schedule.

Second, earnestly increase the protection of cultivated land. Your city should guide Yixing City to adjust the planning layout of the permitted construction areas, conditional construction areas, and restricted construction areas determined by the plan in accordance with the approved plan modification plan to ensure that the amount of cultivated land and permanent basic farmland area does not decrease and the quality is improved. 2. Improved ecology, strictly control the scale of planning and construction land, and implement the strictest arable land protection system and land conservation system.

Third, strengthen the space control of construction land. Your city shall instruct Yixing to strengthen the planning review of the land for construction projects based on the adjusted boundary of the permitted construction area and strictly control the layout and scale of urban and rural construction land. Give full play to the role of planning as a leader in control and arrange all kinds of land use activities. The urban and rural construction land must be selected in the permitted construction area determined by the overall land use plan, and must not be broken through without authorization.

Fourth, carefully organize the implementation of the plan. Your city should guide Yixing to modify the plan in accordance with the approved plan, timely complete the overall land use planning and database update, and strengthen the connection with the preparation of land and space planning. Carefully implement the tasks and measures proposed in the plan, standardize the implementation management of the plan, improve the efficiency of plan implementation, and ensure that the planning goals are achieved.

People's Government of Jiangsu Province

December 6, 2019

(This is publicly available)

Scan on your phone to open the current page